Dec 26, 2024  
2019-20 BTC Catalog 
    
2019-20 BTC Catalog [ARCHIVED CATALOG]

Add to Portfolio (opens a new window)

CET 110 Construction And Highway Surveys

5 CR
Calculations for horizontal and vertical alignments will be emphasized.  Determining cut and fill values for establishing final elevations for construction projects, as well as marking of survey stakes to communicate location and elevation information to construction workers will be covered.  Students will learn stakeout procedures for a variety of construction projects.  In addition, the students will develop techniques to help the student learn to use horizontal and vertical curves in the field and office to join tangent lines.
Prerequisite(s): ENGT 134  and CET 102 , both with a C or higher, or Instructor permission.



Add to Portfolio (opens a new window)